In short
- Four ways reach a finca: fibre, fixed wireless (5G/FWA), radio link (WISP) and satellite. Which one works depends on where the plot sits.
- Only the cadastral-plot query on the official map is binding – not "the village has fibre".
- Radio link and wireless need line of sight to the mast, satellite a clear sky. Without the condition, no tariff helps.
- Size the bandwidth by the number of users, not by the advertised peak figure.
Why the answer depends on the place, not the provider
On the mainland you ask about the best tariff. On Mallorca you ask about the address first. The island depends on undersea cables, the terrain is mountainous, and landscape protection – above all in the Serra de Tramuntana – limits the roll-out. The result: coverage varies sharply within the island, not just between island and mainland (kompara.es, comparison portal, 2026).
The key distinction is between the village centre and scattered plots. An isolated plot on `suelo rústico` drops out of the population-based coverage figures. "The village has fibre" therefore does not mean "the finca has fibre". If you are buying a high-end property and depend on the connection, settle this before the notary appointment, not after.
Fibre: broad on the coast, thin inland
Fibre (FTTH) is widely built out in the urban and coastal zones – Palma, Calvià, Manacor, Inca. Movistar and Orange deliver there, alongside ConectaBalear with its own network, which by the provider's account reaches over 200 Balearic localities and covers the centres of most municipalities (conectabalear.com, provider figure, 2026). Advertised tariffs start at around €25 a month.
Inland – Raiguer, Pla de Mallorca – it thins out. Fibre often ends at the village centre, and there is no tariff price for the spur to an outlying finca: the cost sits in the trench length and the civil works, not in the monthly plan. No serious provider quotes a flat figure for that digging – it accrues per metre, per plot.
Fixed wireless and radio link: it all hangs on line of sight
Where there is no cable, wireless steps in. Fixed wireless (FWA) over 4G/5G is marketed as "Internet Radio" (Movistar), "5G en casa" (Orange) or portable from around €21 to €33 a month, usually with a loaned router and unlimited data. Real speed runs from about 40 Mbps to 1 Gbps depending on coverage (redeszone.net, 2026). The condition: mobile coverage at the site and often a properly aimed antenna to the mast.
Radio link (WISP/WiMAX) is more common on Mallorca than on the mainland. Alongside ConectaBalear, Infotelecom and Movilfly run their own wireless networks for rural zones; latency is low and the link stable, but slower than fibre. The hard condition is stated by the providers themselves: you need direct line of sight to the transmitting antenna – "raramente disponible", rarely available (movilfly.com). A hill, a stand of trees or the neighbouring building in between, and the order comes to nothing. You check that line of sight on site, not on a map.
Satellite: the fallback when cable and wireless fail
That leaves the sky. Starlink delivers regardless of trench or mast, but demands a clear view upward. Prices in Spain changed several times in 2026 – currently around €29 (Residencial 100), €45 (200) and €65 a month (Max, over 400 Mbps), with kit rental last at €10 and waived as a promotion from 1 August 2026 (elchapuzasinformatico.com, May 2026). Treat these figures as a snapshot, not a fixed budget.
There is also the state-backed alternative UNICO Demanda Rural: satellite at 100 Mbps for €35 a month in remote zones, plus an installation grant of up to €600. The application deadline ran to 31 May 2026 and has therefore probably passed; a new 2026 edition was announced (planderecuperacion.gob.es). Whether the deadline is still open must be checked legally in each case.
Before you buy: query the plot, not the postcode
The most important step costs nothing. Since June 2025 there is the official "Mapa de Servicios de Banda Ancha Fija" from the State Secretariat for Telecommunications. It can be queried by address or 14-digit cadastral reference, shows the individual cadastral plot as its smallest unit, and separates wired networks (fibre/HFC) from wireless (digital.gob.es, 2026).
Why the plot and not the postcode? On the same street one building can have fibre and the next not (comparandonos.com). The postcode query is a rough filter; only the address or plot query is binding. Do not rely on the seller's or agent's word on coverage – it is well meant and rarely verified. That location check belongs at the start of any network plan for a larger property.
What the line has to carry
The advertised peak speed says little about daily life with guests. Netflix recommends 15 to 25 Mbps per 4K stream, and a 4K film pulls around 7 GB per hour (infobae.com, January 2026). Work it out for a house with a guest cottage: four simultaneous 4K streams already come to 60–100 Mbps on paper – before uploads, video calls and smart home. That is an example built from documented single figures, not a measurement, but it shows the direction: a wireless or radio link rated at "40 Mbps" gets tight at full occupancy.
| Way | Condition on site | Price range (provider figure) | Typical limit |
|---|---|---|---|
| Fibre (FTTH) | network reaches the plot | from ~€25/month | outlying spur: cost per metre |
| Fixed wireless (5G/FWA) | mobile coverage, antenna aim | ~€21–33/month | speed drops at full occupancy |
| Radio link (WISP) | direct line of sight to mast | provider-dependent | impossible without line of sight |
| Satellite (Starlink/UNICO) | clear sky | ~€29–65 or €35/month | volatile prices, check deadline |
When it gets expensive – and when it simply won't work
It gets expensive when the fibre ends 300 metres before the gate and you carry the spur yourself: civil works along a private route cost more than a connection in the village centre, and no advertised figure covers it. It becomes impossible when none of the four conditions is met – no cable at the plot, no usable mobile coverage, no line of sight to the mast and no clear sky. That is rare, but it happens on wooded Tramuntana slopes. Then, honestly, no provider helps, and you want to know that before you buy.
For most fincas it comes down to a combination: a main line plus a second way as fallback. What that redundancy looks like in practice, and how much fail-safety it buys, depends on the property – we plan that on site, not over the phone. Talk to us before the purchase contract is signed; afterwards the options are the same, but your bargaining position is not. Examples of properties we have looked after from the line to the servicing are in our references.
Tick off before you buy
- Obtained the finca's cadastral reference and queried it on digital.gob.es (not just the postcode)
- Checked whether fibre reaches the plot or ends at the village centre
- For wireless/radio link: confirmed line of sight to the mast on site
- For satellite: checked the clear sky, treated Starlink prices as a snapshot
- Cleared the UNICO deadline and antenna rights on `suelo rústico` legally
- Sized bandwidth by the number of simultaneous users, not the advertised figure
- Planned a second way as fallback rather than betting on a single line
Related reading
German-speaking IT service for fincas, villas and businesses on Mallorca. Networks, Wi-Fi, security technology and smart home — planned, installed and maintained.