What we do – and what we do not
We build the groundwork, not the control system. That means: conduits in the right places, network sockets where a control panel will hang later, stable wireless coverage throughout the house and a technical room where everything comes together.
The control system itself – lighting, shading, heating – is done by your electrician or your systems integrator. That is their craft, and they do it better than we would. But without clean infrastructure, none of it works.
The network is the backbone
Control panels, gate control, cameras, sound system, TV, workstation: in a modern house almost everything depends on the network. If it is shaky, the whole smart home feels unreliable – even when the control system itself is flawless.
- Cable wherever a device has a fixed place
- Stable wireless coverage for everything that moves – indoors and outdoors
- Separate networks for building technology, guests and your own devices
- Secure access from home, without exposing the building technology to the internet
Planning with architect and electrician
The best time is the shell construction. Well-planned conduits cost little during construction and a lot afterwards – getting conduits into a finished stone wall later is expensive. We coordinate with the architect and electrician so that network, control system and technical room fit together.
Why the electrician alone usually does not cover this is explained in the article IT planning in a new build.
Estates with several buildings
Main house, guest house, pool house, garage: on large estates the building technology has to work across several buildings. Between buildings we connect by fibre or point-to-point radio, depending on what can be laid. For the control system it then looks like a single network.
Existing houses and renovations
Much can be prepared without a shell construction too. In many houses we manage using existing cable routes, exterior trunking or radio links between buildings. Whether that is enough is something we see during the visit – and we tell you before you decide.
What fits well alongside
Cameras, entry and alarm alerts we install ourselves, based on UniFi – more under Alarm systems and cameras. They run over the same network and can be included in the planning from the start.
How it works
1. A conversation. What should the house be able to do later, who builds the control system, how far along is the construction?
2. Plans and a visit on site. We look at the plans and the buildings and define conduits, sockets, access points and the technical room.
3. Coordination. With architect, electrician and systems integrator, so nothing is built twice or not at all.
4. Installation. Network, cabling and technical room, with documentation at the end.
5. Handover. Whoever programs the control system receives from us a network that is documented and works.
What it costs
Giving a figure in advance would not be serious. The price depends on how many buildings are covered, whether it is a new build or a renovation and how much is to be prepared. An afternoon of planning during construction often saves many times that later. That is why we look at the property instead of guessing.
The consultation itself costs you nothing. Only the journey is charged — and we refund half of it once you place the order. After that there is a dependable figure on paper.
What we can say in advance: we are not the cheapest provider on the island. The difference rarely lies in the equipment — it lies in the planning beforehand and the care afterwards.
FAQ
Do you also program the control system?
No. We build the groundwork: network, conduits, wireless coverage and technical room. Control of lighting, shading and heating is done by your electrician or systems integrator.
Which smart home system should we choose?
You decide that with whoever builds the control system. We make sure the infrastructure fits and does not rule out a later change.
Is the groundwork worth it if we do not want a control system yet?
Yes, especially during construction. Conduits and sockets cost little now. Getting into a finished wall later costs many times more.
Does it work in an existing house?
Usually yes, with more effort. Existing cable routes, exterior trunking or radio links are often enough. We see that during the visit.
Do you work with our electrician?
Yes, and the earlier the better. Half an hour of coordination at the start saves opening a wall later.
Related: Services for fincas and villas · Networks and Wi-Fi · Alarm systems and cameras · IT for businesses and large estates